WPP team has transportation the Oversize cargoes from Thaioil : WBS A laydown and Gate 27/3 to THAIOIL : WBS-C03 and WBS-E04
This shipment have the many oversize and heavy cargoes, we needed to visited the Thaioil : WBS A laydown and Gate 27/3 site for measuring the Length Width and Height of cargoes for process the transportdrawing and calculation as according to regulations before operation the oversize cargoes to the destination.
Therefore, WPP team decided setting the route survey and transportation teams for protection the cargoes without defect, becasue those oversize dimension cargoes need to lifitng-tailing and lifting down on the installation area
We were transportation the cargoes by hydraulic trailer 6 - 14 Axles lines, becasue the cargoes are oversize and heavy cargoes we can't use normally traliers to transportation those cargoes, That's route have a little curves and road narrows. Therefore, we need to used the hydraulic traliers for took the turning radius with safety transportation process.
Before process, we need to first safety talk and tools box meeting becasue we should transportation on the night and moving to stand-by point on the morning, Therefore, we need to setting the traffic plan for avoid the traffic crowed and checking the lashing point everytime when convoys were parking for preventive an accident on the transportation.
We has to transportation in Thaioil site around
- Totally 37 packages // 620.27 CBM // 994.17 Tons
However, we're still working within standard of safety and protection your cargoes under Transportation Management System (TMS) like our cargoes. And we're hope to service with you.
Best regards
WPP Team.
Duration Date : 29th March 2024 - on process in current at Thaioil : WBS A laydown and Gate 27/3 to THAIOIL : WBS-C03 and WBS-E04